Wrong wetted materials mean corrosion, leaks and downtime in a chemical plant.
Start with the medium. Hydrochloric acid eats 316L electrodes under some conditions, so match the electrode to the chemical. Then temperature: a liner that can’t take the process heat fails years early. You also need flow range, pressure, conductivity and a full pipe.
Q&T sizes on the process first, the pipe second. We’ve done this 20 years, have meters in over 160 countries, and are China’s No.1 exporter of electromagnetic flowmeters.